KARNATAKA NEERAVARI NIGAM LIMITED
(A Government of Karnataka Undertaking)

OFFICE OF THE, EXECUTIVE ENGINEER, KNNL.
UPPER  TUNGA PROJECT DIVISION, RATTIHALLI.

CORRIGENDUM No. 3 TOTENDER NOTIFICATION NO. 01 /2007-08,dated:- 12-07-2007.
            Ref:- 1) This Office Tender Notification No. 01/2007-08, Dated:12-07-07,Ltr.No.KNNL/ EE/UTPB/RTL/PB-1/ Tender/ 2007-08/ 598, Dated: 12.07.2007.

   2) Corrigendum No. 1 to Tender Notification No.1/2007-08, Vide Ltr.  Even No.645, Dated: 19.07.2003.

3) Corrigendum No. 2 to Tender Notification No.1/2007-08, Vide Ltr.even No.760, and Dated: 07.08.2007                      

      In partial modification to the above cited tender notification, modifications in respect of name of work amount put to tender, EMD there on, and dates 0f calendar of events of tender are given as below and contractors are requested to please note.


Sl.No.    as per Tender Notification

Modified name of work

Modified Amount put to tender in Rs. Lakhs

Modified EMD in Rs. Lakhs.

1

2

3

4

a) Main canal works.

1

Construction of Regulator –cum-Escape at Ch: 97.075Km and CTC at Ch: 106.675Km of UTP Main canal (Second call)

220.11

2.21

3

Providing lining   to U.T.P. Main Canal Km. 107 and 108 UTP Main canal.

183.26

1.84

4

Providing lining  to U.T.P. Main Canal Km. 122 UTP Main canal.

121.50

1.22

5

Construction of i) Super passage cum CTC at ch, 93.850 Km
ii) Super passage at Ch: 94.150Km, iii) Depressed box culvert at ch: 94.425Km.iv) Protective works to Road bridge at ch: 96.270 Km and v) Construction of Inlet at ch: 108.240 Km of UTP Main canal.

83.68

0.84

6

Construction of  i) CTC at ch: 117.700Km ii) Sopanam at ch: 117.135 Km iii) Construction of wing walls to super passage at ch: 116.550Km,  CTC at ch: 116.950 Km & 120.370 Km of UTP Main canal.

49.63

0.50

7.

Construction of  at SP ch: 120.000Km and CTC at ch: 121.400Km of UTP Main canal.

36.30

0.37

8.

Construction of Lead offdrain and Improvements to Road near Madag masur canal in 124Km of UTP main canal and construction of lead of drains from ch: 114.00 to ch: 114.500Km of UTP main canal.

56.45

0.57

Distributory works.

17)

Construction of Lead of drain from Road bridge at ch: 2980 Mtr. To Box culvert at Ch: 3080m. & Protective work to CTC at ch: 4.120Km of UTP Distry No.1.

22.32

0.23

18)

Construction of depressed culvert at i) ch: 0.600Km ii) Depressed culvert at 2.250 Km iii) CTC at ch: 10705m. iv) Depressed culvert at ch: 13.960Km v) depressed culvert at ch: 15.060Km vi) CTC at ch: 18.500Km & 19.200 Km and vii) Inlet at ch: 11400m of UTP Distry No.1.

24.76

0.25

The calendars of events are as follows: - 


                                                 Manual

e-Tendering

1)

Issue of blank Tender document at a) Notified places

04.03.2008 upto 5.30pm

04.03.2008 10.30 am onwards

 

b) Division Office

06.03.2008 upto 5.30pm

 

2)

Receipt of completed sealed tenders

10.03.2008upto 4.00 pm

10.03.2008 upto 4.00 pm.

3)

Submission of Original EMD Instruments for e-tender at
a) Division Office

 

11.03.2008 upto 5.30pm

 

b) at Regd. Office of KNNL Bangalore

 

12.03.2008 upto 11.00 am

4)

Opening of pre-qualifications documents at Regd. Office of KNNL Bangalore

12.03.2008   at 11.00 am

12.03.2008 at 11.00 am

5)

Opening price bids.

15.03.2008 at 11.00 am

15.03.2008 at 11.00 am

Note:
1) Other conditions and stipulations remain unaltered.
2) Calendar events for works under Sl.No.2 & 9 to 16 will be intimated later.
3) Further information can be had from the Office of the undersigned during office hours (Phone No. 08376-258443)

                     Sd/-
Executive Engineer,

                                                                                                                                KNNL, UTP Division, Rattihalli

Tq. Hirekerur Dist. Haveri.