KARNATAKA NEERAVARI NIGAM LIMITED
(A Government of Karnataka Undertaking)
OFFICE OF THE, Executive Engineer, KNNL, HBC Divn., Athani – 591 304.

Phone (08289) 251034

 

 


No./KNNL/HBC/Corrigendum/KEC/56-75/08-09/2526                                                          Dtd:  03-02–2009



CORRIGENDUM

 

Name of work

:

Construction of Karimasuti  East canal including lining & structures in Km. 56.00 to 75.00 (10.00 works) – Regarding postponement.

Ref

1)

This office tender Notification No./KNNL/HBC/PB-2/TND/KEC            56-75/2008-09/1456         Dtd:  30-09-2008

 

2)

-do- time extension No./KNNL/HBC/PB/TND/Time Extension/2008-09/1814            Dtd:   14-11-2008

 

3)

-do- time extension No./KNNL/HBC/PB/TND/Time Extension/         2008-09/2037    Dtd:   15-12-2008

 

4)

-do- time extension No./KNNL/HBC/PB/TND/Time Extension/         2008-09/2249   Dtd:   06-01-2009

In continuation of tender notification & time extension published vide references above, due to unavoidable reasons, the dates fixed for the above tender works are postponed and also the estimated amount & EMD have been modified as mentioned below.

Sl. No

Name of work

Approximate amount put to tender (Rs. in lakhs)

EMD in lakhs

Cost of e-tending form/ tender document (including KST)

Category enrolled under KNNL/ Class-I PWD  contractors

Stipulated period for completion (including monsoon)

1

Construction of Karimasuti East canal including structures in Km. 56 &            Km. 57

208.01

2.08

26000

Category-III & above

12 months

2

Construction of Karimasuti East canal including structures in Km. 58

128.50

1.29

26000

Class-I & above

-do-

3

Construction of Karimasuti East canal including structures in Km. 59

137.08

1.37

26000

-do-

-do-

4

Construction of Karimasuti East canal including structures in Km. 60

95.11

0.96

15600

-do-

-do-

5

Construction of Karimasuti East canal including structures in Km. 61

144.94

1.45

26000

-do-

-do-

6

Construction of Karimasuti East canal including structures in Km. 62

95.00

0.95

15600

-do-

-do-

7

Construction of Karimasuti East canal including structures in Km. 64 & 65

159.62

1.60

26000

-do-

-do-

8

Construction of Karimasuti East canal including structures in Km. 66, Km. 67 & Km. 68

186.60

1.87

26000

-do-

-do-

9

Construction of Karimasuti East canal including structures in Km. 69, Km. 70 & Km. 71

179.13

1.80

26000

-do-

-do-

10

Construction of Karimasuti East canal including structures in Km. 72, Km. 73, Km. 74 & Km. 75

149.53

1.50

26000

-do-

-do-

MODIFIED DATES

Sl.No.

Particulars

Present modified dates

1)

Last date for applications & issue of blank tender documents.

25.02.2009

2)

Date of receipt of completed tender documents.

03.03.2009

3)

Date of opening of tender.

05.03.2009

 The other conditions stipulated in the original tender notification remains unchanged.
                                                                                                         


Sd/-xx
                                                                                                                            Executive Engineer,
                                                                                                  KNNL HBC Division, Athani.