SHORTERM PERCENTAGE TENDER NOTIFICATION No.02/2009-10, Dated .05.2009.
(MANUAL CUM E-TENDER)
Sealed percentage tenders in duplicate by manual & e-tender system in the prescribed form in duplicate are invited by the undersigned on behalf of The Managing Director, KNNL, Bangalore, from the eligible contractors having registered with KPWD and enrolled in selected list of contractors of KNNL.
The blank e-tender documents can be obtained through web site “ www.knnlindia.com” by linking to e-tender ( i.e. once you are in the above web site, click on to e-tender wizard, which will link to “ www.tenderwizard.com” where electronic tendering is provided) and can be submitted through electronic tender box available therein.
Manual tendering, the aspiring bidders may i) Submit their applications (along with requisite non refundable cost of blank tender form) ii) Receive blank tender documents iii) Submit the sealed tenders, at the following places on the notified dates.
The bidders should indicate in their application, the place where they are desired to receive blank tender documents.
1. The Registered office of KNNL, Coffee Board Building, IV Floor, Dr. B.R.Ambedkar Road, Bangalore.
2. The Central Office of the KNNL, WALMI Building Belgaum Road, Belur Dharawad.
3. Office of the Chief Engineer, KNNL, UTP Zone , Shimoga.
4. Office of the Executive Engineer, KNNL, UTP Division, Rattihalli, Hirekerur Taluk, Haveri District. (08376 258433).
STATEMENT OF WORK PUT TO TENDER. MANUAL CUM E-TENDERING
Sl.
No. |
Name of work |
Package |
Amount put to Tender ( Rs. In Lakhs) |
EMD ( Rs. In Lakhs) |
Cost of blank tender documents including Taxes (Non-refundable) |
Eligibility of Contractor |
Stipulated period for completion ( including monsoon) |
1 |
2 |
3 |
|
4 |
5 |
6 |
7 |
1 |
Construction of FIC under a)D.O.R No 1 at ch 88.800 KM b) D.O.R No. 2 at Ch 89.300 KM c) D.O.R No 3 at ch 90.575 Km d) D.O.R No 4 at Ch 90.825Km e) D.O.R No 5 at Ch 91.775Km f) DOR No 6 at Ch 92.400 KM and all outlets of Minor No 1 off taking at ch 92.850km UTP main canal including Sub Minor No 1 of Minor No 1 of UTP main canal |
MFC-1 |
55.76 |
56000 |
15600 |
KPWD Class-I & Above |
6 Calendar
Months |
2 |
Construction of FIC under all outlets of Minor No2 off taking at Ch 94.750 KM of UTP main canal |
MFC-2 |
68.27 |
69000 |
15600 |
KPWD Class-I & Above |
6 Calendar
Months |
3 |
Construction of FIC under a) DOR No -97 at Ch 97.950 KM b) DOR NO -8 at Ch 98.250 KM c) DOR No-9 at Ch 99.050KM & all outlets of Minor No 3 off taking at Ch 99.525 Km of UTP main canal |
MFC-3 |
60.33 |
61000 |
15600 |
KPWD Class-I & Above |
6 Calendar
Months
|
4 |
Construction of FIC under all outlets of Minor No 4 off taking at Ch 99.925 KM |
MFC-4 |
20.06 |
21000 |
15600 |
KPWD Class-II & Above |
6 Calendar
Months |
5 |
Construction of FIC a) DOR No 10 at Ch 100.70 Km b) DOR NO 11 at Ch 101.100 Km and all outlets of Minor No 5 off taking Ch 101.725 KM of UTP Km of UTP main canal |
MFC-5 |
32.23 |
33000 |
15600 |
KPWD Class-I & Above |
6 Calendar
Months |
6 |
Construction of FIC under DOR No 12 at Ch 103.775 Km and all outlets of Minor No 6 off taking at Ch 104.520 KM of UTP main Canal |
MFC-6 |
154.14 |
155000 |
26000 |
KPWD Class-I & Above |
6 Calendar
Months |
7 |
Construction of FIC under DOR No 13 at Ch 105.367 KM DOR NO 14 at Ch 107.605 KM and all outlets of Minor No 7 offtaking at Ch 106.605 Km of UTP main canal |
MFC -7 |
27.79 |
28000 |
15600 |
KPWD Class-I & Above |
3 Calendar
Months |
8 |
Construction of FIC under all outlets of Minor No 8 off taking at Ch 109.936 Km of UTP main canal |
MFC-8 |
130.25 |
130000 |
26000 |
KPWD Class-I & Above |
6 Calendar
Months |
9 |
Construction of FIC under all outlets of Minor No 9 off taking at Ch 113.616 Km of UTP main canal |
MFC-9 |
16.93 |
26000 |
4160 |
KPWD Class-II & Above |
3 Calendar
Months |
10 |
Construction of FIC under all outlets of Minor No-10 off taking at Ch 114.510 Km of UTP main Canal |
MFC-10 |
65.61 |
66000 |
15600 |
KPWD Class-I & Above |
3 Calendar Months |
11 |
Construction of FIC under all outlets of Minor No 11 off taking at Ch 115.790 Km of UTP Main Canal |
MFC-11 |
22.44 |
23000 |
15600 |
KPWD Class-II & Above |
3 Calendar
Months |
12 |
Construction of FIC under all outlets of Minor No 12 off taking at Ch 116.410 Km and DOR No 15 at Ch 117. 795 Km of UTP Main Canal |
MFC-12 |
33.81 |
34000 |
15600 |
KPWD Class-I & Above |
3 Calendar
Months |
13 |
Construction of FIC under all outlets of Minor No 13 off taking at Ch 118.570 KM of UTP Main Canal 3 |
MFC-13 |
64.69 |
65000 |
15600 |
KPWD Class-I & Above |
6 Calendar
Months |
14 |
Construction of FIC under a) DOR No 16 af ch 120.375km (b)DOR No 17 af ch 120.575km (c)DOR No 18 at ch 121.676km and all outlets of Minor No 14 offtaking af ch 122.350km of UTP main canal |
MFC-14 |
32.55 |
33000 |
15600 |
KPWD Class-I & Above |
3 Calendar
Months |
15 |
Construction of FIC under a) DOR No 19 at ch 124.600km (b)DOR No 20 at ch 125.647km (c)DOR No 21 at ch 126.680km (d)DOR No 22 at ch 127.688km (e)DOR No 23 at ch 128.297km (f)DOR No 24 at ch 128.630km (g)DOR No 25 at ch 128.844km and all outlets under Minor 15 off taking at ch 130.453km of UTPmain canal. |
MFC-15 |
67.23 |
68000 |
15600 |
KPWD Class-I & Above |
6 Calendar
Months |
16 |
Construction of FIC under a)DOR No 26 at ch 131.779km (b)DOR No 27 at ch 130.875km (c)DOR No 28 at ch 132.456km (d)DOR No 29 at ch 132.456km (e)DOR No 29 at ch 133.450km and all outlets of Minor No 16 off taking at ch 133.785km of UTP main canal |
MFC-16 |
26.32 |
27000 |
15600 |
KPWD Class-I & Above |
3 Calendar
Months |
17 |
Construction of FIC under all outlets of minor No 17 off taking at ch 136.557km and DOR No 30 at ch 137.262km of UTP main canal |
MFC-17 |
21.11 |
22000 |
15600 |
KPWD Class-II & Above |
3 Calendar
Months |
18 |
Construction of FIC under all outlets of minor No 18 off taking at ch 138.370km of utp main canal |
MFC-18 |
16.78 |
26000 |
4160 |
KPWD Class-II & Above |
3 Calendar Months |
19 |
Construction of FIC under all outlets of Minor No 19 off taking at ch 139.695km UTP main canal |
MFC-19 |
68.67 |
69000 |
15600 |
KPWD Class-I & Above |
6 Calendar
Months |
20 |
Construction of FIC under all outlets of Minor No 20 off taking at ch 141.395km of UTp main canal |
MFC-20 |
61.27 |
62000 |
15600 |
KPWD Class-I & Above |
6 Calendar
Months |
21 |
Construction of FIC under a)DOR No 31 at ch 146.618km (b)DOR No 32 at ch 147.738km and outlets of minor No 21 off taking at ch 148.630km of UTP main canal |
MFC-21 |
43.96 |
44000 |
15600 |
KPWD Class-I & Above |
6 Calendar Months |
22 |
Construction of FIC under all outlets of minor No 22 offtaking at ch 150.279km of UTP main canal |
MFC-22 |
49.14 |
50000 |
15600 |
KPWD Class-I & Above |
6 Calendar
Months |
23 |
Construction of FIC under all outlets minor No 23 off taking at ch 150.446km of UTP main canal |
MFC-23 |
199.90 |
200000 |
26000 |
Category-III & Above |
9 Calendar
Months |
24 |
Construction of FIC under all outlets of Minor No 24 off taking at ch 152.825km and DOR no 33 at ch 154.930km of UTP main canal |
MFC-24 |
31.88 |
32000 |
15600 |
KPWD Class-I & Above |
3 Calendar
Months
|
25 |
Construction of FIC under DOR No 1 to DOR No 3 of distry No 1 and all outlets of Minor No-1 offtaking at ch 2.907km of UTP Diatry no 1 |
DFC-1 |
57.57 |
58000 |
15600 |
KPWD Class-I & Above |
6 Calendar Months |
26 |
Construction of FIc under DOR 4 to DOR 8 of distrybutory No 1 all and all outlets of Minor No 2 off taking at ch 5.690km of UTP Distry no 1 |
DFC-2 |
107.43 |
108000 |
26000 |
KPWD Class-I & Above |
9 Calendar
Months |
27 |
Construction of FIC under DOR 9 & 10 and all outlets of Minor No 3 off taking at ch 6.856km of UTP Distry no 1 |
DFC-3 |
40.87 |
41000 |
15600 |
KPWD Class-I & Above |
6 Calendar
Months |
28 |
Construction of FIC under DOL 1-DOL 3 and all outlets of Minor No 4 off taking at ch 8.020km of UTP Distry no 1 |
DFC-4 |
85.29 |
86000 |
15600 |
KPWD Class-I & Above |
9 Calendar
Months |
29 |
Construction of FIC under all outlets of Minor
No 5 of off taking at ch 8.020km UTP Distry No 1 |
DFC-5 |
50.68 |
51000 |
15600 |
KPWD Class-I & Above |
6 Calendar
Months |
30 |
Construction of FIC under all outlets of Minor No 6 off taking at ch 11.119km of UTP Distry No 1 |
DFC-6 |
38.27 |
39000 |
15600 |
KPWD Class-I & Above |
6 Calendar
Months |
31 |
Construction of FIC under all outlets of Minor No 7 off taking at ch 11.119km of UTP Distry No 1 |
DFC-7 |
106.37 |
107000 |
26000 |
KPWD Class-I & Above |
9 Calendar
Months |
32 |
Construction of FIC under all outlets of Minor No 8 off taking at ch 11.833km of UTP Distry No 1 |
DFC-8 |
50.67 |
51000 |
15600 |
KPWD Class-I & Above |
6 Calendar
Months |
33 |
Construction of FIC under all outlets of minor No 9 off taking at ch 11.833km of UTP Distry No 1 |
DFC-9 |
25.56 |
26000 |
15600 |
KPWD Class-I & Above |
3 Calendar Months |
34 |
Construction of FIC under DOL No- 4-DOL No -5,DOR No-12 DOR No-13 and all outlets of Minor No 10 off taking at ch 13.478km of UTP Distry no 1 |
DFC-10 |
60.44 |
61000 |
15600 |
KPWD Class-I & Above |
6 Calendar Months |
35 |
Construction of FIC under all outlets of minor No 11 off taking at ch 13.478km of UTP Distry No 1 |
DFC-11 |
29.90 |
30000 |
15600 |
KPWD Class-I & Above |
3 Calendar Months |
36 |
Construction of FIC under DOL No-6 to DOL No-9, DOR No 14, DOR No 15 and all outlets under Minor No 12 off taking at ch 15.290km of UTP Distry No 1 |
DFC-12 |
88.02 |
89000 |
15600 |
KPWD Class-I & Above |
6 Calendar Months |
37 |
Construction of FIC under DOR No-16 and outlets of Minor No 13 off taking at ch 15.909km of UTP Distry No 1 |
DFC-13 |
62.43 |
63000 |
15600 |
KPWD Class-I & Above |
6 Calendar Months |
38 |
Construction of FIC under DOR No-17 to DOR No-23, DOR No-10 to DOL No-17 and Tailend outlet and outlets under minor no 14 off taking at ch 16.766km of UTP Distry no 1 |
DFC-14 |
127.99 |
128000 |
26000 |
KPWD Class-I & Above |
9 Calendar Months |
CALENDAR OF EVENTS OF TENDERING
Sl. No. |
Details |
Dates of calendar events |
Manual |
e-tender |
01 |
Last date for receipt of requisition for blank tender documents. |
|
|
|
a) At notified places |
22-06-2009 Up to 5-30 Pm. |
22-06-2009 Up to 5.30Pm. |
|
b) At Division Office. |
22-06-2009 Up to 5-30 Pm. |
22-06-2009 Up to 5.30Pm. |
02 |
Submission demand drafts for e-tender blank documents at division office |
- |
23-06-2009 Up to 5.30PM. |
03 |
Issue of blank tender documents
a) At Notified places & access to e-tender
b) At Division Office |
03-07-2009 Up to 5.30PM. |
03-07-2009 10.30PM. onwards |
04-07-2009 Up to 5.30PM. |
- |
04 |
Date of Receipt & completed & sealed manual tenders & e-tender |
08-07-2009 Up to 4.00PM. |
08-07-2009 Up to 4.00PM. |
05 |
Submission of original instrument of EMD |
|
|
|
a) At Division Office |
|
09-07-2009 Up to 5.30PM. |
|
b) At Registered office of KNNL, Bangalore |
|
10-07-2009 Up to 11.00AM. |
07 |
Opening of price bids of works costing less than 50.00 lakhs , pre-qualification details of works costing more than 50.00 lakhs. At Registered office of KNNL, Bangalore |
10.07-2009 At 11.00AM. |
10-07-2009 At 11.00AM.
|
08 |
Opening of price bids of Sl.No. works costing more than 50.00 lacks . |
Date will be intimated separately to the pre-qualified bidders |
Date will be intimated separately to the pre-qualified bidders |
Note:
1. If any of the date mentioned above happens to be general holiday, the next working day will holds good.
2. The amount for the blank tender document (Non refundable) shall be paid in the form of D.D or Bankers Cheque of a Nationalized/Scheduled Bank drawn in favour of KNNL. Payable at Hirekerur D.D., date, amount and name of Bank etc., shall be mentioned in their application.
3. The blank tender documents can be obtained through website www.knnlindia.com by linking to e-Tendering ( i.e., once you are in the above website, click on E-Tender provided) and can be submitted through electronic tendering is provided) and can be submitted through electronic tender box available there in.
4. The contractor will obtained tender documents form the web site fill them, submit the completed tender document in to electronic tender box on the website itself, The EMD shall be scanned and attached to the e-Tendering documents along with pre-qualification documents.
5. E.M.D shall be in the form of D.D or Bank Guarantee/Banker’s cheque of scheduled bank draw in favour of Karnataka Neeravari Nigam Limited, and payable at Hirekerur. District: Haveri, The validity of E.M.D Shall be submitted for minimum period of 180 days.
6. The Officer competent to accept tenders have the right to reject or accept any or all the tenders without assigning any reasons.
7. The intending tender shell submit the completed tender along with EMD and pre-qualification details in section I & II Section Ist is price bid and Section –II is EMD and other relevant document , such as pre-qualification documents etc.,
THE PRE-QUALIFICATION CONDITIONS FOR THE WORKS COSTING OF RS.50.00 LAKHS AND ABOVE FOR KPWD CLASS-I CONTRACTORS.
1. The contractor should have executed and completed one single work of similar nature costing not less than the amount put tender in any one year during last three years as a prime contractor.
2. The Annual turnover of the bidder should be more than the amount put tender for which they have intended to bid , in any one year during last three years.
3. The probable quantum of work proposed to be entrusted to the contractor is depending upon the financial turn over (Average turn over of last three years)
4. The contractor should have ownership of at least the following machineries equipments
a) Excavator of not less than 0.9cum capacity -1 No.
b) Tipper of not less than 4cum capacity -2 No.s
c) Concrete mix of not less than 7Cft. Capacity with hopper -2 No.s
d) All other materials required for constructions of works , such as water tanker, vibrator, centering and formwork materials etc.,
5) Pre qualification is not required for the contractors of the selected list of contractors of KNNL , but they should submit EMD, Category certificate and other relevant documents in Section –II.
8. The following certificate shall be scanned and attached to the e-tender documents.
- Contractor’s enrollment letter under KNNL/registration certification from KPWD.
- Employee provident fund (E.P.F) registration certificate.
- Karnataka Sales Tax clearance certificate.
- All the above original certificates shall be produced at the time of opening of tender for verification.
- The contractor should attach his/her scanned signature to the Schedule”B” before submitting.
09. Conditional tenders are liable to be rejected. The officer competent to accept the tender shall have the right to reject any or all tenders with out assigning any reason whatsoever.
10. Corrigendum will be published in the website for all modification/corrections if any.
11. Total cost of work on hand in KNNL with one contractor should not exceed Rs. 20.00 cores (Rupees Twenty cores) excluding cost of any major works like dam, barrage, lift irrigation, gates etc.,
12. The intending bidders should know that, if any of lands either in part/parts or in whole required for the work is not acquired by the NIGAM, it shall be the responsibility of the bidder to take possession of such land and start the work by consent from the land owners before commencements of work at no extra cost to the NIGAM. And no claim what so ever relating to non0availability of land would be entertained.
13. Bidders for the works who have already executed the work and/or whoare executing the work under KARNATAKA NEERAVARI NIGAM LIMITED should enclose the performance certificate from the concerned Executive Engineer, for having satisfactorily executed or satisfactorily executing the work under taken by them under KARNATAKA NEERAVARI NIGAM LIMITED. Such tender received without performance certificates or with unsatisfactory performance are liable for rejection.
14. Further information can be had from the office of the undersigned during office hours (phone: 08376-258443).
Executive Engineer,
KNNL, UTP Division,
Rattihalli-581116.
Hirekerur Taluk, Haveri District.
|